Boch Honda West

  • Location:Westford, Massachusetts
  • Construction Costs:52,000 SF
  • Status:Completed in 2011

Veitas and Veitas Engineers provided structural design for a new dealership featuring a state-of-the-art service area designed to solidify Boch’s commitment to their customers.

The showroom roof framing used a combination of wide flange beams and custom joist girders to deliver a column-free area. The front curved edge of the mezzanine was designed by using a combination of segmented gage pour stops and steel plates. The wave canopy was designed by utilizing tube steel which was bent to follow the pattern across the front of the showroom.